Swift 1 is a 240MW hydro power project. It is located on Lewis river/basin in Washington, the US. According to GlobalData, who tracks and profiles over 170,000 power plants worldwide, the project is currently active. It has been developed in a single phase. Post completion of construction, the project got commissioned in 1958. Buy the profile here.
Description
The project is currently owned by PacifiCorp with a stake of 100%.
Development status
The project got commissioned in 1958.
Contractors involved
Voith Hydro Holding was selected as the turbine supplier for the hydro power project. The company provided 3 units of francis turbines, each with 80MW nameplate capacity.
GE Renewable Energy supplied 2 electric generators for the project. The generator capacity is 75.55 MVA.
GE Renewable Energy supplied 1 electric generator for the project. The generator capacity is 94.4 MVA.