Ta Thang is a 60MW hydro power project. It is located on Ngoi Bo river/basin in Lao Cai, Vietnam. According to GlobalData, who tracks and profiles over 170,000 power plants worldwide, the project is currently active. It has been developed in a single phase. Buy the profile here.
Description
Ta Thang is a run-of-river project. The net head of the project is 148.2m. The penstock length is 377.45m. The project generated 245.2 GWh of electricity. The project cost is $45.504m.
Contractors involved
Chongqing Water Turbine Works was selected as the turbine supplier for the hydro power project. The company provided 2 units of francis turbines, each with 30.7MW nameplate capacity.
Chongqing Water Turbine Works supplied 2 electric generators for the project. The generator capacity is 35 MVA.