Tiuni Plasu is a 72MW hydro power project. It is planned on Tons river/basin in Uttarakhand, India. According to GlobalData, who tracks and profiles over 170,000 power plants worldwide, the project is currently at the announced stage. It will be developed in a single phase. The project construction is likely to commence in 2027 and is expected to enter into commercial operation in 2029. Buy the profile here.
Description
The project is being developed by Uttarakhand Project Development and Construction and is currently owned by Uttarakhand Jal Vidyut Nigam.
Tiuni Plasu is a run-of-river project. The gross head and net head of the project will be 67m and 63m respectively. The total number of penstocks, pipes or long channels that carry water down from the hydroelectric reservoir to the turbines inside the actual power station, is expected to be 3 in number. The penstock length will be 110m. The penstock diameter will be 4m. The project is expected to generate 293.9 GWh of electricity.
The hydro power project consists of 3 turbines, each with 24MW nameplate capacity.
Development status
The project construction is expected to commence from 2027. Subsequent to that it will enter into commercial operation by 2029.
For more details on Tiuni Plasu, buy the profile here.
Data Insights
From
The gold standard of business intelligence.
Blending expert knowledge with cutting-edge technology, GlobalData’s unrivalled proprietary data will enable you to decode what’s happening in your market. You can make better informed decisions and gain a future-proof advantage over your competitors.