Tolyatti (Togliatti) TPP is a 545MW gas fired power project. It is located in Samara, Russia. According to GlobalData, who tracks and profiles over 170,000 power plants worldwide, the project is currently active. It has been developed in multiple phases. The project construction commenced in 1957 and subsequently entered into commercial operation in December 1960. Buy the profile here.
Description
The project is currently owned by T Plus Group with a stake of 100%.
It is a Steam Turbine with Cogen power plant. The power plant run on dual-fuel. The primary fuel being used to power the plant is natural gas. In case of shortage of natural gas the plant can also run on Coal.
Development status
The project construction commenced in 1957 and subsequently entered into commercial operation in December 1960.
Contractors involved
Tolyatti (Togliatti) TPP (Tolyatti (Togliatti) TPP Unit I) is equipped with Ural Turbine Works PT-65/75-130/13 turbines. The phase consists of 1 turbine with 65MW nameplate capacity.
Tolyatti (Togliatti) TPP (Tolyatti (Togliatti) TPP Unit II) is equipped with Ural Turbine Works PT-65/75-130/13 steam turbines. The phase consists of steam turbines with 65MW nameplate capacity.
Tolyatti (Togliatti) TPP (Tolyatti (Togliatti) TPP Unit III) is equipped with Leningrad Metal Works P-25-130 steam turbine. The phase consists of 1 steam turbine with 25MW nameplate capacity.
Tolyatti (Togliatti) TPP (Tolyatti (Togliatti) TPP Unit IV) is equipped with Leningrad Metal Works P-25-130 steam turbines. The phase consists of steam turbines with 25MW nameplate capacity.
Tolyatti (Togliatti) TPP (Tolyatti (Togliatti) TPP Unit IX) is equipped with Leningrad Metal Works P-50-130/15 steam turbines. The phase consists of steam turbines with 50MW nameplate capacity.
Tolyatti (Togliatti) TPP (Tolyatti (Togliatti) TPP Unit V) is equipped with Ural Turbine Works PT-80/100-130/13 steam turbines. The phase consists of steam turbines with 80MW nameplate capacity.
Tolyatti (Togliatti) TPP (Tolyatti (Togliatti) TPP Unit VI) is equipped with Leningrad Metal Works P-35-130/4-21 steam turbines. The phase consists of steam turbines with 35MW nameplate capacity.
Tolyatti (Togliatti) TPP (Tolyatti (Togliatti) TPP Unit VII) is equipped with Leningrad Metal Works T-100-130 steam turbine. The phase consists of 1 steam turbine with 100MW nameplate capacity.
Tolyatti (Togliatti) TPP (Tolyatti (Togliatti) TPP Unit VIII) is equipped with Leningrad Metal Works T-100-130 steam turbines. The phase consists of steam turbines with 100MW nameplate capacity.
NPO Elsib supplied TVF-60-2, TVF-100-2, TVF-120-2, TVF-63-2E, TVF-63-2U3, Hydrogen Cooled electric generator for the project.
For more details on Tolyatti (Togliatti) TPP, buy the profile here.