Torbole is a 124MW hydro power project. It is located on Cavedine river/basin in Trentino-Alto Adige, Italy. According to GlobalData, who tracks and profiles over 170,000 power plants worldwide, the project is currently active. It has been developed in a single phase. Post completion of construction, the project got commissioned in 1961. Buy the profile here.

Description

Dolomiti Energia and Macquarie European Infrastructure Fund are currently owning the project having ownership stake of 51% and 49% respectively.

Torbole is a reservoir based project. The gross head of the project is 176.3m. The penstock length is 257m. The penstock diameter is 4.4m. The project generated 338.8 GWh of electricity.

The project has 2 electric generators installed at the site. The generator capacity is 65 MVA.

Development status

The project got commissioned in 1961.

Contractors involved

Ansaldo Energia was selected as the turbine supplier for the hydro power project. The company provided 2 units of francis turbines, each with 62.3MW nameplate capacity.

For more details on Torbole, buy the profile here.