Toros is a 50MW hydro power project. It is located on Cakit river/basin in Adana, Turkey. According to GlobalData, who tracks and profiles over 170,000 power plants worldwide, the project is currently active. It has been developed in a single phase. Post completion of construction, the project got commissioned in 2013. Buy the profile here.
Description
The project is developed and owned by Aydem Yenilenebilir Enerji. The company has a stake of 100%.
The project generated 231 GWh of electricity. The project cost is $143.769m.
Development status
The project got commissioned in 2013.
For more details on Toros, buy the profile here.
About Aydem Yenilenebilir Enerji
Aydem Yenilenebilir Enerji AS (Aydem Yenilenebilir), is a renewable energy company that develops and operates hydroelectric power plant to produce electricity. The company produces electricity by utilizing geothermal, hydroelectric, thermal, solar, wind and landfill gas sources. Its activities include power generation, energy sales, electricity distribution, photovoltaic panel production, and solar power plant EPC. Bereket Enerji prepares its feasibility reports and makes the design, construction, installation and operation of power plants. The company’s projects include Yagmur Hydroelectric Power project, Pinarim Gida Solar Power project, Yatagan Lignite Power Plant, Ozellikleri Landfill Gas Power Plants, Yalova Wind Power project, Central Anatolia Thermal Power Plant project, and others. It has operations throughout Turkey. Aydem Yenilenebilir is headquartered in Denizli, Turkey.