Track 4A Gas Fired Power Plant is a 1,440MW gas fired power project. It is located in Johor, Malaysia. According to GlobalData, who tracks and profiles over 170,000 power plants worldwide, the project is currently active. It has been developed in multiple phases. Post completion of construction, the project got commissioned in January 2021. Buy the profile here.
Description
The project was developed by Southern Power Generation Sdn. Tenaga Nasional and SIPP Energy Sdn are currently owning the project having ownership stake of 70% and 30% respectively.
It is a Combined Cycle Gas Turbine (CCGT) power plant. The power plant run on dual-fuel. The primary fuel being used to power the plant is natural gas. In case of shortage of natural gas the plant can also run on Distillate Fuel Oil.
Track 4A Gas Fired Power Plant (Track 4A Gas Fired Power Plant Block I) consists of 1 steam turbine.
Track 4A Gas Fired Power Plant (Track 4A Gas Fired Power Plant Block II) consists of 1 steam turbine.
Development status
The project got commissioned in January 2021.
Power purchase agreement
The power generated from the project is sold to Tenaga Nasional under a power purchase agreement for a period of 21 years.
Contractors involved
CTCI and GE Power were selected to render engineering procurement construction services for the gas fired power project.
Track 4A Gas Fired Power Plant (Track 4A Gas Fired Power Plant Block I) is equipped with GE Power 1x1 SS 9HA.02 gas turbine. The phase consists of 1 gas turbine.
Track 4A Gas Fired Power Plant (Track 4A Gas Fired Power Plant Block II) is equipped with GE Power 1x1 SS 9HA.02 gas turbine. The phase consists of 1 gas turbine.
GE Power supplied electric generator for the Track 4A Gas Fired Power Plant (Track 4A Gas Fired Power Plant Block I).
GE Power supplied electric generator for the Track 4A Gas Fired Power Plant (Track 4A Gas Fired Power Plant Block I).
GE Power supplied electric generator for the Track 4A Gas Fired Power Plant (Track 4A Gas Fired Power Plant Block II).
GE Power supplied electric generator for the Track 4A Gas Fired Power Plant (Track 4A Gas Fired Power Plant Block II).
GE Power supplied steam boiler for the Track 4A Gas Fired Power Plant (Track 4A Gas Fired Power Plant Block I).
GE Power supplied steam boiler for the Track 4A Gas Fired Power Plant (Track 4A Gas Fired Power Plant Block I).
GE Power supplied steam boiler for the Track 4A Gas Fired Power Plant (Track 4A Gas Fired Power Plant Block II).
GE Power supplied steam boiler for the Track 4A Gas Fired Power Plant (Track 4A Gas Fired Power Plant Block II).
Southern Power Generation Sdn is the O&M contractor for thermal power project for a period of 21 years.
For more details on Track 4A Gas Fired Power Plant, buy the profile here.
Data Insights
From
The gold standard of business intelligence.
Blending expert knowledge with cutting-edge technology, GlobalData’s unrivalled proprietary data will enable you to decode what’s happening in your market. You can make better informed decisions and gain a future-proof advantage over your competitors.