Trypilska Coal Fired Power Plant is a 1,225MW coal fired power project. It is located in Kiev, Ukraine. According to GlobalData, who tracks and profiles over 170,000 power plants worldwide, the project is currently active. It has been developed in multiple phases. The project construction commenced in 1967 and subsequently entered into commercial operation in December 1969. Buy the profile here.
Description
The project is currently owned by PJSC Centrenergo with a stake of 100%.
It is a Steam Turbine with Cogen power plant. The power plant run on dual-fuel. The primary fuel being used to power the plant is anthracite. In case of shortage of anthracite the plant can also run on Natural Gas. The fuel is procured from Donetsk Coal Field.
Development status
The project construction commenced in 1967 and subsequently entered into commercial operation in December 1969.
Contractors involved
Trypilska Coal Fired Power Plant (Trypilska Coal Fired Power Plant Unit I) is equipped with Ukrainian Energy Machines K-300-240 steam turbine. The phase consists of 1 steam turbine with 300MW nameplate capacity.
Trypilska Coal Fired Power Plant (Trypilska Coal Fired Power Plant Unit II) is equipped with Ukrainian Energy Machines K-325-23, 5 steam turbine. The phase consists of 1 steam turbine with 325MW nameplate capacity.
Trypilska Coal Fired Power Plant (Trypilska Coal Fired Power Plant Unit III) is equipped with Ukrainian Energy Machines K-300-240 steam turbine. The phase consists of 1 steam turbine with 300MW nameplate capacity.
Trypilska Coal Fired Power Plant (Trypilska Coal Fired Power Plant Unit IV) is equipped with Ukrainian Energy Machines K-300-240 steam turbine. The phase consists of 1 steam turbine with 300MW nameplate capacity.
Electrotyazhmash supplied TGV-300 electric generator for the Trypilska Coal Fired Power Plant (Trypilska Coal Fired Power Plant Unit I).
Electrotyazhmash supplied TGV-300 electric generator for the Trypilska Coal Fired Power Plant (Trypilska Coal Fired Power Plant Unit II).
Electrotyazhmash supplied TGV-300 electric generator for the Trypilska Coal Fired Power Plant (Trypilska Coal Fired Power Plant Unit III).
Electrotyazhmash supplied TGV-300 electric generator for the Trypilska Coal Fired Power Plant (Trypilska Coal Fired Power Plant Unit IV).
Taganrog Boiler-Making Works Krasny Kotelshchik supplied steam boiler for the project.
For more details on Trypilska Coal Fired Power Plant, buy the profile here.