ULU Wind Power Plant is a 120.4MW onshore wind power project. It is located in Bursa, Turkey. According to GlobalData, who tracks and profiles over 170,000 power plants worldwide, the project is currently active. It has been developed in multiple phases. The project construction commenced in 2020 and subsequently entered into commercial operation in 2020. Buy the profile here.
Description
The project was developed by Ulu Yenilenebilir Enerji Uretim. Mogan Energy Investment Holding and Others are currently owning the project having ownership stake of 80% and 20% respectively.
The project generates 353,000MWh electricity and supplies enough clean energy to power 150,000 households.
The ULU Wind Power Plant (ULU Wind Power Plant-I), has 111m high towers.
The ULU Wind Power Plant (ULU Wind Power Plant-II), has 111m high towers.
Development status
The project is currently active. The project construction commenced in 2020 and subsequently entered into commercial operation in 2020.
Contractors involved
ULU Wind Power Plant (ULU Wind Power Plant-I) is equipped with Enercon E-138 EP3 / 3.5 MW turbines. The phase consists of 2 turbines with 3.5MW nameplate capacity.
ULU Wind Power Plant (ULU Wind Power Plant-II) is equipped with Enercon E-138 EP3 E2 / 4.2 MW turbines. The phase consists of 27 turbines with 4.2MW nameplate capacity.
For more details on ULU Wind Power Plant, buy the profile here.
About Ulu Yenilenebilir Enerji Uretim
Ulu Yenilenebilir Enerji Uretim AS (Ulu Yenilenebilir) generates ,transmits and distributes electricity through renewable energy.The company is headquartered in Turkey.