Usak RES is a 163.5MW onshore wind power project. It is planned in Usak, Turkey. According to GlobalData, who tracks and profiles over 170,000 power plants worldwide, the project is currently at the partially active stage. It will be developed in multiple phases. Post completion of the construction, the project is expected to get commissioned in 2013. Buy the profile here.

Description

The project is being developed and currently owned by Aydem Yenilenebilir Enerji. The company has a stake of 100%.

Development status

Post completion of the construction, the project is expected to get commissioned in 2013.

Contractors involved

Usak RES (Usak RES Phase I) will be equipped with Sinovel Wind Group SL1500/89 turbines. The phase consists of 36 turbines with 1.5MW nameplate capacity.

Usak RES (Usak RES Phase IIA) will be equipped with Sinovel Wind Group SL 1500/90 turbines. The phase consists of 4 turbines with 1.5MW nameplate capacity.

Usak RES (Usak RES Phase IIB) will be equipped with Sinovel Wind Group SL 1500/90 turbine. The phase consists of 1 turbine with 1.5MW nameplate capacity.

Usak RES (Usak RES Phase III) will be equipped with Xinjiang Goldwind Science & Technology GW165/6000 turbines. The phase consists of 17 turbines with 6MW nameplate capacity.

Xinjiang Goldwind Science & Technology is expected to perform operations and maintenance for the Usak RES (Usak RES Phase III) for a period of 10 years.

For more details on Usak RES, buy the profile here.

About Aydem Yenilenebilir Enerji

Aydem Yenilenebilir Enerji AS (Aydem Yenilenebilir), is a renewable energy company that develops and operates hydroelectric power plant to produce electricity. The company produces electricity by utilizing geothermal, hydroelectric, thermal, solar, wind and landfill gas sources. Its activities include power generation, energy sales, electricity distribution, photovoltaic panel production, and solar power plant EPC. Bereket Enerji prepares its feasibility reports and makes the design, construction, installation and operation of power plants. The company’s projects include Yagmur Hydroelectric Power project, Pinarim Gida Solar Power project, Yatagan Lignite Power Plant, Ozellikleri Landfill Gas Power Plants, Yalova Wind Power project, Central Anatolia Thermal Power Plant project, and others. It has operations throughout Turkey. Aydem Yenilenebilir is headquartered in Denizli, Turkey.

GlobalData

GlobalData, the leading provider of industry intelligence, provided the underlying research used to produce this article.

This information is drawn from GlobalData’s Power Intelligence Center, which provides detailed profiles of over 170,000 active, planned and under construction power plants worldwide from announcement through to operation across all technologies and countries worldwide.