Uzuncayir is an 84MW hydro power project. It is located on Munzur river/basin in Tunceli, Turkey. According to GlobalData, who tracks and profiles over 170,000 power plants worldwide, the project is currently active. It has been developed in a single phase. The project construction commenced in 1993 and subsequently entered into commercial operation in 2009. Buy the profile here.
Description
The project was developed by General Directorate of State Hydraulic Works and is currently owned by Limak Insaat San Ve Tic.
Uzuncayir is a reservoir based project. The project generated 322 GWh of electricity.
Development status
The project construction commenced in 1993 and subsequently entered into commercial operation in 2009.
Contractors involved
Voith Siemens Hydro Power Generation was selected as the turbine supplier for the hydro power project. The company provided 3 units of francis turbines, each with 27.33MW nameplate capacity.
Voith Siemens Hydro Power Generation supplied 3 electric generators for the project. The generator capacity is 31 MVA.
For more details on Uzuncayir, buy the profile here.