Veria Wind Farm is a 315MW onshore wind power project. It is planned in Central Macedonia, Greece. According to GlobalData, who tracks and profiles over 170,000 power plants worldwide, the project is currently at the permitting stage. It will be developed in multiple phases. Post completion of the construction, the project is expected to get commissioned in 2023. Buy the profile here.

Description

The project is being developed and currently owned by Aeoliki Vermiou EU. The company has a stake of 100%.

The project cost is expected to be around $350m.

The Veria Wind Farm (Veria Wind Farm_Phase V), will have 120m high towers.

Development status

Post completion of the construction, the project is expected to get commissioned in 2023.

Contractors involved

Veria Wind Farm (Veria Wind Farm_Phase I) will be equipped with Nordex N155/4.5 turbines. The phase consists of turbines with 4.5MW nameplate capacity.

Veria Wind Farm (Veria Wind Farm_Phase II) will be equipped with Nordex N155/4.5 turbines. The phase consists of turbines with 4.5MW nameplate capacity.

Veria Wind Farm (Veria Wind Farm_Phase III) will be equipped with Nordex N155/4.5 turbines. The phase consists of turbines with 4.5MW nameplate capacity.

Veria Wind Farm (Veria Wind Farm_Phase IV) will be equipped with Nordex N155/4.5 turbines. The phase consists of turbines with 4.5MW nameplate capacity.

Veria Wind Farm (Veria Wind Farm_Phase V) will be equipped with Nordex N155/4.5 turbines. The phase consists of 37 turbines with 4.5MW nameplate capacity.

For more details on Veria Wind Farm, buy the profile here.

GlobalData

GlobalData, the leading provider of industry intelligence, provided the underlying research used to produce this article.

This information is drawn from GlobalData’s Power Intelligence Center, which provides detailed profiles of over 170,000 active, planned and under construction power plants worldwide from announcement through to operation across all technologies and countries worldwide.