Verkhneteriber is a 130MW hydro power project. It is located on Teriberka river/basin in Murmansk, Russia. According to GlobalData, who tracks and profiles over 170,000 power plants worldwide, the project is currently active. It has been developed in a single phase. The project construction commenced in 1976 and subsequently entered into commercial operation in 1984. Buy the profile here.
Description
The project was developed by JSC Lenhydroproject and is currently owned by Fortum with a stake of 29.45%.
The hydro reservoir capacity is 452 million cubic meter. The net head of the project is 111m. The project generated 245.3 GWh of electricity.
Development status
The project construction commenced in 1976 and subsequently entered into commercial operation in 1984.
Contractors involved
Tyazhmash was selected as the turbine supplier for the hydro power project. The company provided 1 unit of francis turbine with 130MW nameplate capacity.
Power Machines supplied 1 electric generator for the project. The generator capacity is 144.44 MVA.
For more details on Verkhneteriber, buy the profile here.
Data Insights
From
The gold standard of business intelligence.
Blending expert knowledge with cutting-edge technology, GlobalData’s unrivalled proprietary data will enable you to decode what’s happening in your market. You can make better informed decisions and gain a future-proof advantage over your competitors.