Vojany (EVO I) Thermal Power Plant is a 660MW coal fired power project. It is located in Kosice, Slovakia. According to GlobalData, who tracks and profiles over 170,000 power plants worldwide, the project is currently active. It has been developed in multiple phases. Post completion of construction, the project got commissioned in 1965. Buy the profile here.

Smarter leaders trust GlobalData

Report-cover

Premium Insights Vojany (EVO I) Thermal Power Plant

Buy the Profile

Premium Insights

The gold standard of business intelligence.

Find out more

Description

The project is currently owned by Slovenske elektrarne with a stake of 100%.

It is a Steam Turbine power plant that is used for Baseload.

Development status

The project got commissioned in 1965.

Contractors involved

Vojany (EVO I) Thermal Power Plant (Vojany (EVO I) Thermal Power Plant Unit I) is equipped with Doosan Skoda Power K110-130 steam turbine. The phase consists of 1 steam turbine with 110MW nameplate capacity.

Vojany (EVO I) Thermal Power Plant (Vojany (EVO I) Thermal Power Plant Unit II) is equipped with Doosan Skoda Power K110-130 steam turbine. The phase consists of 1 steam turbine with 110MW nameplate capacity.

Vojany (EVO I) Thermal Power Plant (Vojany (EVO I) Thermal Power Plant Unit III) is equipped with Doosan Skoda Power K110-130 steam turbine. The phase consists of 1 steam turbine with 110MW nameplate capacity.

Vojany (EVO I) Thermal Power Plant (Vojany (EVO I) Thermal Power Plant Unit IV) is equipped with Doosan Skoda Power K110-130 steam turbine. The phase consists of 1 steam turbine with 110MW nameplate capacity.

Vojany (EVO I) Thermal Power Plant (Vojany (EVO I) Thermal Power Plant Unit V) is equipped with Leningradsky Metallichesky Zavod Three Casing, Condensing, Impulsive Type K110-140 steam turbine. The phase consists of 1 steam turbine with 110MW nameplate capacity.

Vojany (EVO I) Thermal Power Plant (Vojany (EVO I) Thermal Power Plant Unit VI) is equipped with Leningradsky Metallichesky Zavod Three Casing, Condensing, Impulsive, K110-140 steam turbine. The phase consists of 1 steam turbine with 110MW nameplate capacity.

Doosan Skoda Power supplied Hydrogen-Cooled electric generator for the Vojany (EVO I) Thermal Power Plant (Vojany (EVO I) Thermal Power Plant Unit I).

Doosan Skoda Power supplied Hydrogen-Cooled electric generator for the Vojany (EVO I) Thermal Power Plant (Vojany (EVO I) Thermal Power Plant Unit II).

Doosan Skoda Power supplied Hydrogen-Cooled electric generator for the Vojany (EVO I) Thermal Power Plant (Vojany (EVO I) Thermal Power Plant Unit III).

Doosan Skoda Power supplied Hydrogen-Cooled electric generator for the Vojany (EVO I) Thermal Power Plant (Vojany (EVO I) Thermal Power Plant Unit IV).

Electrosila supplied Air Cooled, TFP–110–2/13,8 electric generator for the Vojany (EVO I) Thermal Power Plant (Vojany (EVO I) Thermal Power Plant Unit V).

Electrosila supplied Air Cooled, TFP–110–2/13,8 electric generator for the Vojany (EVO I) Thermal Power Plant (Vojany (EVO I) Thermal Power Plant Unit VI).

Prvni brnenska strojirna Velka Bites supplied steam boiler for the Vojany (EVO I) Thermal Power Plant (Vojany (EVO I) Thermal Power Plant Unit I). The fuel consumption rate inside the boiler is 43.5Tonnes per hour.

Prvni brnenska strojirna Velka Bites supplied steam boiler for the Vojany (EVO I) Thermal Power Plant (Vojany (EVO I) Thermal Power Plant Unit II). The fuel consumption rate inside the boiler is 43.5Tonnes per hour.

Prvni brnenska strojirna Velka Bites supplied steam boiler for the Vojany (EVO I) Thermal Power Plant (Vojany (EVO I) Thermal Power Plant Unit III). The fuel consumption rate inside the boiler is 43.5Tonnes per hour.

Prvni brnenska strojirna Velka Bites supplied steam boiler for the Vojany (EVO I) Thermal Power Plant (Vojany (EVO I) Thermal Power Plant Unit IV). The fuel consumption rate inside the boiler is 43.5Tonnes per hour.

SES Tlmace supplied steam boiler for the Vojany (EVO I) Thermal Power Plant (Vojany (EVO I) Thermal Power Plant Unit V). The fuel consumption rate inside the boiler is 41.5Tonnes per hour.

SES Tlmace supplied steam boiler for the Vojany (EVO I) Thermal Power Plant (Vojany (EVO I) Thermal Power Plant Unit VI). The fuel consumption rate inside the boiler is 41.5Tonnes per hour.

For more details on Vojany (EVO I) Thermal Power Plant, buy the profile here.

This content was updated on 4 January 2024

Premium Insights

From

The gold standard of business intelligence.

Blending expert knowledge with cutting-edge technology, GlobalData’s unrivalled proprietary data will enable you to decode what’s happening in your market. You can make better informed decisions and gain a future-proof advantage over your competitors.

GlobalData

GlobalData, the leading provider of industry intelligence, provided the underlying research used to produce this article.

This information is drawn from GlobalData’s Power Intelligence Center, which provides detailed profiles of over 170,000 active, planned and under construction power plants worldwide from announcement through to operation across all technologies and countries worldwide.