Windpark Albertshof is a 31.05MW onshore wind power project. It is located in Brandenburg, Germany. According to GlobalData, who tracks and profiles over 170,000 power plants worldwide, the project is currently active. It has been developed in multiple phases. The project construction commenced in 2020 and subsequently entered into commercial operation in March 2021. Buy the profile here.
Description
The project is developed and owned by Windpark Albertshof.
The electricitiy generated from the plant has offsetted 27,216t of carbon dioxide emissions (CO2) a year. The project cost is $41.869m.
The Windpark Albertshof (Windpark Albertshof-I), has 141.5m high towers.
The Windpark Albertshof (Windpark Albertshof-II), has 141.5m high towers.
Development status
The project is currently active. The project construction commenced in 2020 and subsequently entered into commercial operation in March 2021.
Contractors involved
Vestas Wind Systems was selected to render engineering procurement construction services for the wind power project.
Windpark Albertshof (Windpark Albertshof-I) is equipped with Vestas Wind Systems V117-3.45 MW turbines. The phase consists of 8 turbines with 3.45MW nameplate capacity.
Windpark Albertshof (Windpark Albertshof-II) is equipped with Vestas Wind Systems V126-3.45MW turbine. The phase consists of 1 turbine with 3.45MW nameplate capacity.
Vestas Wind Systems is the O&M contractor for the wind power project. The operation and maintenance contract commenced from 2021, for a period of 23 years.