Qinzhou Coal Fired Power Plant is a 3,200MW coal fired power project. It is located in Guangxi Zhuang Autonomous Region, China. The project is currently active. It has been developed in multiple phases. Post completion of construction, the project got commissioned in November 2007.

Project Type Total Capacity (MW) Active Capacity (MW) Pipeline Capacity (MW) Project Status Project Location Project Developer
Thermal 3,200 3,200 Active Guangxi Zhuang Autonomous Region, China

Description

The project is currently owned by SDIC Qinzhou Power Generation.

It is a steam turbine power plant that is used for Baseload.

Development Status

The project got commissioned in November 2007.

Contractors Involved

SEPCOIII Electric Power Construction was selected to render EPC services for the Qinzhou Coal Fired Power Plant (Qinzhou Coal Fired Power Plant Phase I Unit I) project. SEPCOIII Electric Power Construction was selected to render EPC services for the Qinzhou Coal Fired Power Plant (Qinzhou Coal Fired Power Plant Phase I Unit II) project.

Qinzhou Coal Fired Power Plant (Qinzhou Coal Fired Power Plant Phase I Unit I) is equipped with Dongfang Turbine N600-24.2/566/566 steam turbine. The phase consists of 1 steam turbine with 600MW nameplate capacity.

Qinzhou Coal Fired Power Plant (Qinzhou Coal Fired Power Plant Phase I Unit II) is equipped with Dongfang Turbine N600-24.2/566/566 steam turbine. The phase consists of 1 steam turbine with 600MW nameplate capacity.

DEC Dongfang Electric Machinery supplied QFSN-655-2-22A electric generator for the Qinzhou Coal Fired Power Plant (Qinzhou Coal Fired Power Plant Phase I Unit I).

DEC Dongfang Electric Machinery supplied QFSN-655-2-22A electric generator for the Qinzhou Coal Fired Power Plant (Qinzhou Coal Fired Power Plant Phase I Unit II).

MHPS Dongfang Boiler supplied steam boiler for the Qinzhou Coal Fired Power Plant (Qinzhou Coal Fired Power Plant Phase I Unit I).

MHPS Dongfang Boiler supplied steam boiler for the Qinzhou Coal Fired Power Plant (Qinzhou Coal Fired Power Plant Phase I Unit II).

Methodology

All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.