Ramat Hovav Combined Cycle Power Plant is a 711MW gas fired power project. It is located in South, Israel. The project is currently active. It has been developed in multiple phases. Post completion of construction, the project got commissioned in July 1999.

Project Type Total Capacity (MW) Active Capacity (MW) Pipeline Capacity (MW) Project Status Project Location Project Developer
Thermal 711 711 Active South, Israel

Description

The project is currently owned by The Israel Electric.

It is a Combined Cycle Gas Turbine (CCGT) power plant that is used for Baseload. The power plant run on dual-fuel. The primary fuel being used to power the plant is natural gas. In case of shortage of natural gas the plant can also run on Diesel.

Development Status

The project got commissioned in July 1999.

Contractors Involved

The Israel Electric was selected to render EPC services for the Ramat Hovav Combined Cycle Power Plant (Ramat Hovav Combined Cycle Power Plant Block II).

Ramat Hovav Combined Cycle Power Plant (Ramat Hovav Combined Cycle Power Plant Block I) is equipped with GE Power gas turbines.

Ramat Hovav Combined Cycle Power Plant (Ramat Hovav Combined Cycle Power Plant Block I) is equipped with GE Power 9E.03 gas turbines. The phase consists of 2 gas turbines.

Ramat Hovav Combined Cycle Power Plant (Ramat Hovav Combined Cycle Power Plant Block II) is equipped with Doosan Skoda Power steam turbine. The phase consists of 1 steam turbine with 116MW nameplate capacity.

Ramat Hovav Combined Cycle Power Plant (Ramat Hovav Combined Cycle Power Plant Block II) is equipped with Siemens SGT5-4000F gas turbine. The phase consists of 1 gas turbine with 260MW nameplate capacity.

GE Power supplied electric generator for the Ramat Hovav Combined Cycle Power Plant (Ramat Hovav Combined Cycle Power Plant Block I).

Siemens supplied Air Cooled electric generator for the Ramat Hovav Combined Cycle Power Plant (Ramat Hovav Combined Cycle Power Plant Block II).

Siemens Heat Transfer Technology supplied steam boiler for the Ramat Hovav Combined Cycle Power Plant (Ramat Hovav Combined Cycle Power Plant Block I).

Methodology

All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.