S. Giacomo is a 448MW hydro power project. It is located on Adda river/basin in Abruzzo, Italy. The project is currently active. It has been developed in single phase.
Project Type | Total Capacity (MW) | Active Capacity (MW) | Pipeline Capacity (MW) | Project Status | Project Location | Project Developer | Hydropower | 448 | 448 | – | Active | Abruzzo, Italy |
---|
Description
The project is currently owned by Enel.
The hydro reservoir capacity is 216 million cubic meter. The gross head of the project is 653m. The penstock length is 583m. The penstock diameter is 2.5m. The project generated 290.89 GWh of electricity.
Contractors Involved
Voith Hydro Holding was selected as the turbine supplier for the hydro power project. The company provided 1 unit of francis turbine.
Voith Hydro Holding was selected as the turbine supplier for the hydro power project. The company provided 6 units of pelton turbines.
Ansaldo Energia supplied 1 electric generator for the project. The generator capacity is 310 MVA.
Methodology
All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.