San Gaban I is an 110MW hydro power project. It is planned on San Gaban river/basin in Puno, Peru. The project is currently in permitting stage. It will be developed in single phase. Post completion of the construction, the project is expected to get commissioned in 2024.

Project Type Total Capacity (MW) Active Capacity (MW) Pipeline Capacity (MW) Project Status Project Location Project Developer
Hydropower 110 110 Permitting Puno, Peru Empresa de Generacion Electrica San Gaban

Description

The project is being developed and currently owned by Empresa de Generacion Electrica San Gaban.

San Gaban I is a run-of-river project. The net head of the project will be 567.5m. The project cost is expected to be around $224.926m.

The hydro power project consists of 2 units of pelton turbines.

The nameplate capacity of electric generator(s) to be installed at the project site is 88 MVA.

Development Status

Post completion of the construction, the project is expected to get commissioned in 2024.

Methodology

All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.