San Manuel 1 Solar Power Project is a 70MW solar PV power project. It is planned in Ilocos, Philippines. The project is currently in permitting stage. It will be developed in single phase. The project construction is likely to commence in 2022 and is expected to enter into commercial operation in 2023.

Project Type Total Capacity (MW) Active Capacity (MW) Pipeline Capacity (MW) Project Status Project Location Project Developer
Solar PV 70 70 Permitting Ilocos, Philippines Pilipinas Newton Energy

Description

The project is being developed and currently owned by Pilipinas Newton Energy.

San Manuel 1 Solar Power Project is a ground-mounted solar project which is planned over 70 hectares.

The project cost is expected to be around $98.35m.

Development Status

The project construction is expected to commence from 2022. Subsequent to that it will enter into commercial operation by 2023.

About Pilipinas Newton Energy

Pilipinas Newton Energy Corp (Pilipinas Newton Energy) generates ,transmits and distributes electricity. Pilipinas Newton Energy is headquartered in Taguig City, Metro Manila,Philippines.

Methodology

All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.