SDIC Datong Coal Fired Power Plant is a 270MW coal fired power project. It is located in Shanxi, China. The project is currently active. It has been developed in multiple phases. Post completion of construction, the project got commissioned in November 2010.

Project Type Total Capacity (MW) Active Capacity (MW) Pipeline Capacity (MW) Project Status Project Location Project Developer
Thermal 270 270 Active Shanxi, China

Description

It is a Steam Turbine power plant.

Development Status

The project got commissioned in November 2010.

Contractors Involved

Harbin Turbine was selected as the turbine supplier for the Coal fired project. The company supplied NKZ150-13.24/535/535 ultra-high pressure model steam turbines for the project.

Harbin Electric Machinery supplied QF-150-2 air-cooled, three-phase synchronous electric generator for the project.

Harbin Boiler supplied steam boiler for the project.

Methodology

All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.