Severnaya (Shimal) Combined Cycle Power Plant is a 789MW gas fired power project. It is located in Absheron, Azerbaijan. The project is currently active. It has been developed in multiple phases. Post completion of construction, the project got commissioned in November 2002.
Project Type | Total Capacity (MW) | Active Capacity (MW) | Pipeline Capacity (MW) | Project Status | Project Location | Project Developer | Thermal | 789 | 789 | – | Active | Absheron, Azerbaijan | Azerenergy |
---|
Description
The project is developed and owned by Azerenergy.
It is a Combined Cycle Gas Turbine (CCGT) power plant that is used for Baseload.
Development Status
The project got commissioned in November 2002.
How well do you really know your competitors?
Access the most comprehensive Company Profiles on the market, powered by GlobalData. Save hours of research. Gain competitive edge.
Thank you!
Your download email will arrive shortly
Not ready to buy yet? Download a free sample
We are confident about the unique quality of our Company Profiles. However, we want you to make the most beneficial decision for your business, so we offer a free sample that you can download by submitting the below form
By GlobalDataContractors Involved
Azenco was selected to render EPC services for the Severnaya (Shimal) Combined Cycle Power Plant (Severnaya (Shimal) Combined Cycle Power Plant II) project. Mitsui was selected to render EPC services for the Severnaya (Shimal) Combined Cycle Power Plant (Severnaya (Shimal) Combined Cycle Power Plant I) project. Toyo Engineering was selected to render EPC services for the Severnaya (Shimal) Combined Cycle Power Plant (Severnaya (Shimal) Combined Cycle Power Plant II) project.
Severnaya (Shimal) Combined Cycle Power Plant (Severnaya (Shimal) Combined Cycle Power Plant I) is equipped with Mitsubishi Power M701F gas turbine. The phase consists of 1 gas turbine.
Severnaya (Shimal) Combined Cycle Power Plant (Severnaya (Shimal) Combined Cycle Power Plant II) is equipped with Mitsubishi Heavy Industries steam turbine. The Gas fired phase consists 1 steam turbine.
Severnaya (Shimal) Combined Cycle Power Plant (Severnaya (Shimal) Combined Cycle Power Plant II) is equipped with Mitsubishi Power M701F gas turbine. The phase consists of 1 gas turbine.
ABB supplied electric generator for the Severnaya (Shimal) Combined Cycle Power Plant (Severnaya (Shimal) Combined Cycle Power Plant I).
Mitsubishi Electric supplied electric generator for the Severnaya (Shimal) Combined Cycle Power Plant (Severnaya (Shimal) Combined Cycle Power Plant II).
John Cockerill Group supplied steam boiler for the Severnaya (Shimal) Combined Cycle Power Plant (Severnaya (Shimal) Combined Cycle Power Plant I).
About Azerenergy
Azerenergy JSC is engaged in producing electricity. The company is headquartered at Baku, Azerbaijan.
Methodology
All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.