Shinagawa Combined Cycle Power Plant is a 1,140MW gas fired power project. It is located in Tokyo, Japan. The project is currently active. It has been developed in multiple phases. Post completion of construction, the project got commissioned in July 2001.
Project Type | Total Capacity (MW) | Active Capacity (MW) | Pipeline Capacity (MW) | Project Status | Project Location | Project Developer | Thermal | 1,140 | 1,140 | – | Active | Tokyo, Japan |
---|
Description
The project is currently owned by JERA with a stake of 100%.
It is a combined cycle gas turbine (ccgt) power plant.
Development Status
The project got commissioned in July 2001.
How well do you really know your competitors?
Access the most comprehensive Company Profiles on the market, powered by GlobalData. Save hours of research. Gain competitive edge.
Thank you!
Your download email will arrive shortly
Not ready to buy yet? Download a free sample
We are confident about the unique quality of our Company Profiles. However, we want you to make the most beneficial decision for your business, so we offer a free sample that you can download by submitting the below form
By GlobalDataContractors Involved
Toshiba JSW Power Systems was selected to render EPC services for the gas fired power project.
Shinagawa Combined Cycle Power Plant (Shinagawa Combined Cycle Power Plant Block I) is equipped with GE Power 9FA gas turbine. The phase consists of 1 gas turbine with 247MW nameplate capacity.
Shinagawa Combined Cycle Power Plant (Shinagawa Combined Cycle Power Plant Block I) is equipped with GE Power Single Casing Single Flow Type steam turbine. The phase consists of 1 steam turbine with 133MW nameplate capacity.
Shinagawa Combined Cycle Power Plant (Shinagawa Combined Cycle Power Plant Block II) is equipped with GE Power 9FA gas turbine. The phase consists of 1 gas turbine with 247MW nameplate capacity.
Shinagawa Combined Cycle Power Plant (Shinagawa Combined Cycle Power Plant Block II) is equipped with GE Power Single Casing Single Flow Type steam turbine. The phase consists of 1 steam turbine with 133MW nameplate capacity.
Shinagawa Combined Cycle Power Plant (Shinagawa Combined Cycle Power Plant Block III) is equipped with GE Power 9FA gas turbine. The phase consists of 1 gas turbine with 247MW nameplate capacity.
Shinagawa Combined Cycle Power Plant (Shinagawa Combined Cycle Power Plant Block III) is equipped with GE Power Single Casing Single Flow Type steam turbine. The phase consists of 1 steam turbine with 133MW nameplate capacity.
GE Power supplied electric generator for the Shinagawa Combined Cycle Power Plant (Shinagawa Combined Cycle Power Plant Block I).
GE Power supplied electric generator for the Shinagawa Combined Cycle Power Plant (Shinagawa Combined Cycle Power Plant Block II).
GE Power supplied electric generator for the Shinagawa Combined Cycle Power Plant (Shinagawa Combined Cycle Power Plant Block III).
Toshiba Energy Systems and Solutions supplied steam boiler for the Shinagawa Combined Cycle Power Plant (Shinagawa Combined Cycle Power Plant Block I).
Toshiba Energy Systems and Solutions supplied steam boiler for the Shinagawa Combined Cycle Power Plant (Shinagawa Combined Cycle Power Plant Block II).
Toshiba Energy Systems and Solutions supplied steam boiler for the Shinagawa Combined Cycle Power Plant (Shinagawa Combined Cycle Power Plant Block III).
Methodology
All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.