Sodra Cell Morrum Plant is a 57.1MW biopower project. It is located in Blekinge, Sweden. The project is currently active. It has been developed in multiple phases. Post completion of construction, the project got commissioned in 1962.
Project Type | Total Capacity (MW) | Active Capacity (MW) | Pipeline Capacity (MW) | Project Status | Project Location | Project Developer | Biopower | 57.1 | 57.1 | – | Active | Blekinge, Sweden |
---|
Description
The project is currently owned by Sodra Cell.
The project generates 150GWh of electricity.
The process of combustion has been adopted in this project to release the stored energy from the feed. Industrial waste and wood by-product are used as a feedstock to power the project.
Development Status
How well do you really know your competitors?
Access the most comprehensive Company Profiles on the market, powered by GlobalData. Save hours of research. Gain competitive edge.
Thank you!
Your download email will arrive shortly
Not ready to buy yet? Download a free sample
We are confident about the unique quality of our Company Profiles. However, we want you to make the most beneficial decision for your business, so we offer a free sample that you can download by submitting the below form
By GlobalDataThe project got commissioned in 1962.
Contractors Involved
Sodra Cell Morrum Plant (Sodra Cell Morrum Plant Phase I) is equipped with ABB turbine. The phase consists of 1 turbine with 12.5MW nameplate capacity.
Sodra Cell Morrum Plant (Sodra Cell Morrum Plant Phase II) is equipped with Siemens turbine. The phase consists of 1 turbine with 22.3MW nameplate capacity.
Sodra Cell Morrum Plant (Sodra Cell Morrum Plant Phase III) is equipped with MAN Energy Solutions turbine. The phase consists of 1 turbine with 22.3MW nameplate capacity.
The steam boilers for the biopower project have been supplied by Neles and Sumitomo SHI FW Energia.
Methodology
All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.