Soto de Ribera Power Plant IV & V is an 857.8MW gas fired power project. It is located in Asturias, Spain. The project is currently active. It has been developed in multiple phases. Post completion of construction, the project got commissioned in November 2008.
Project Type | Total Capacity (MW) | Active Capacity (MW) | Pipeline Capacity (MW) | Project Status | Project Location | Project Developer | Thermal | 857.8 | 857.8 | – | Active | Asturias, Spain |
---|
Description
The project is currently owned by EDP Espana SAU with a stake of 100%.
It is a Combined Cycle Gas Turbine (CCGT) power plant. The power plant run on dual-fuel. The primary fuel being used to power the plant is natural gas. In case of shortage of natural gas the plant can also run on Diesel.
Development Status
The project got commissioned in November 2008.
How well do you really know your competitors?
Access the most comprehensive Company Profiles on the market, powered by GlobalData. Save hours of research. Gain competitive edge.
Thank you!
Your download email will arrive shortly
Not ready to buy yet? Download a free sample
We are confident about the unique quality of our Company Profiles. However, we want you to make the most beneficial decision for your business, so we offer a free sample that you can download by submitting the below form
By GlobalDataContractors Involved
Duro Felguera and GE Power were selected to render EPC services for the gas fired power project.
Soto de Ribera Power Plant IV & V (Soto de Ribera Power Plant IV) is equipped with GE Power GT26 gas turbine. The phase consists of 1 gas turbine with 269.8MW nameplate capacity.
Soto de Ribera Power Plant IV & V (Soto de Ribera Power Plant IV) is equipped with GE Power STF15C, Single Axis, Double Case, Three Compression steam turbine. The phase consists of 1 steam turbine with 156MW nameplate capacity.
Soto de Ribera Power Plant IV & V (Soto de Ribera Power Plant V) is equipped with GE Power GT26 gas turbine. The phase consists of 1 gas turbine with 274MW nameplate capacity.
Soto de Ribera Power Plant IV & V (Soto de Ribera Power Plant V) is equipped with GE Power STF15C, Single Axis, Double Case, Three Compression steam turbine. The phase consists of 1 steam turbine with 158MW nameplate capacity.
GE Power supplied Topgas electric generator for the Soto de Ribera Power Plant IV & V (Soto de Ribera Power Plant IV).
GE Power supplied Topgas electric generator for the Soto de Ribera Power Plant IV & V (Soto de Ribera Power Plant V).
GE Power supplied steam boiler for the Soto de Ribera Power Plant IV & V (Soto de Ribera Power Plant IV).
GE Power supplied steam boiler for the Soto de Ribera Power Plant IV & V (Soto de Ribera Power Plant V).
GE Power is the O&M contractor for thermal power project.
Methodology
All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.