Sunkoshi 2 is a 1,116MW hydro power project. It is planned on Sunkoshi river/basin in Janakpur, Nepal. The project is currently in announced stage. It will be developed in single phase. The project construction is likely to commence in 2027 and is expected to enter into commercial operation in 2031.

Project Type Total Capacity (MW) Active Capacity (MW) Pipeline Capacity (MW) Project Status Project Location Project Developer
Hydropower 1,116 1,116 Announced Janakpur, Nepal

Description

The project is currently owned by Nepal Electricity Authority .

Sunkoshi 2 is a pumped storage project. The hydro reservoir capacity is planned to be 3,511 million cubic meter. The gross head and net head of the project will be 130.7m and 127.93m respectively. The penstock diameter will be 10.4m. The project is expected to generate 4,760 GWh of electricity. The project cost is expected to be around $1,519.746m.

The hydro power project consists of 3 units of francis turbines.

Development Status

The project construction is expected to commence from 2027. Subsequent to that it will enter into commercial operation by 2031.

Methodology

All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.