Superior Solar Project is a 150MW solar PV power project. It is planned in Michigan, the US. The project is currently in permitting stage. It will be developed in single phase. The project construction is likely to commence in 2022 and is expected to enter into commercial operation in 2023.

Project Type Total Capacity (MW) Active Capacity (MW) Pipeline Capacity (MW) Project Status Project Location Project Developer
Solar PV 150 150 Permitting Michigan, the US Savion

Description

The project is being developed and currently owned by Savion.

Superior Solar Project is a ground-mounted solar project which is planned over 2,000 acres.

The project is expected to supply enough clean energy to power 40,000 households. The project cost is expected to be around $161.7m.

Development Status

The project construction is expected to commence from 2022. Subsequent to that it will enter into commercial operation by 2023.

About Savion

Savion LLC (Savon) is a integrated electric utility company that generates, transmits, distributes, and sells electric energy; and produces electricity through solar and also develops utility-scale solar and energy storage projects. The company is located in United States.

Methodology

All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.