Tavazzano Combined Cycle Power Plant is a 1,140MW gas fired power project. It is located in Lombardy, Italy. The project is currently active. It has been developed in multiple phases. Post completion of construction, the project got commissioned in January 2005.
Project Type | Total Capacity (MW) | Active Capacity (MW) | Pipeline Capacity (MW) | Project Status | Project Location | Project Developer | Thermal | 1,140 | 1,140 | – | Active | Lombardy, Italy |
---|
Description
The project is currently owned by EP Power Europe with a stake of 100%.
It is a combined cycle gas turbine (ccgt) power plant. The power plant run on dual-fuel. The primary fuel being used to power the plant is natural gas. In case of shortage of natural gas the plant can also run on Fuel Oil. The fuel is procured from SNAM Rete Gas.
Tavazzano Combined Cycle Power Plant (Tavazzano Combined Cycle Power Plant Block I) consists of 1 steam turbine with 260MW nameplate capacity.
Tavazzano Combined Cycle Power Plant (Tavazzano Combined Cycle Power Plant Block II) consists of 1 steam turbine with 130MW nameplate capacity.
How well do you really know your competitors?
Access the most comprehensive Company Profiles on the market, powered by GlobalData. Save hours of research. Gain competitive edge.
Thank you!
Your download email will arrive shortly
Not ready to buy yet? Download a free sample
We are confident about the unique quality of our Company Profiles. However, we want you to make the most beneficial decision for your business, so we offer a free sample that you can download by submitting the below form
By GlobalDataDevelopment Status
The project got commissioned in January 2005.
Contractors Involved
Tavazzano Combined Cycle Power Plant (Tavazzano Combined Cycle Power Plant Block I) is equipped with GE Power 9FA gas turbines. The phase consists of 2 gas turbines with 250MW nameplate capacity.
Tavazzano Combined Cycle Power Plant (Tavazzano Combined Cycle Power Plant Block II) is equipped with GE Power 9FA gas turbine. The phase consists of 1 gas turbine with 250MW nameplate capacity.
STF supplied steam boiler for the project.
Methodology
All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.