Tekeze is a 300MW hydro power project. It is located on Tekeze river/basin in Tigray, Ethiopia. The project is currently active. It has been developed in single phase. The project construction commenced in 2002 and subsequently entered into commercial operation in 2009.
Project Type | Total Capacity (MW) | Active Capacity (MW) | Pipeline Capacity (MW) | Project Status | Project Location | Project Developer | Hydropower | 300 | 300 | – | Active | Tigray, Ethiopia |
---|
Description
The project is currently owned by Ethiopian Electric Power.
The hydro reservoir capacity is 9,000 million cubic meter. The gross head of the project is 188m. The total number of penstocks, pipes or long channels that carry water down from the hydroelectric reservoir to the turbines inside the actual power station, are 4 in number. The project cost is $360m.
Development Status
The project construction commenced in 2002 and subsequently entered into commercial operation in 2009.
How well do you really know your competitors?
Access the most comprehensive Company Profiles on the market, powered by GlobalData. Save hours of research. Gain competitive edge.
Thank you!
Your download email will arrive shortly
Not ready to buy yet? Download a free sample
We are confident about the unique quality of our Company Profiles. However, we want you to make the most beneficial decision for your business, so we offer a free sample that you can download by submitting the below form
By GlobalDataContractors Involved
Sinohydro was selected to render EPC services for the hydro power project.
Dongfang Electric was selected as the turbine supplier for the hydro power project. The company provided 4 units of francis turbines, each with 75MW nameplate capacity.
Dongfang Electric supplied 4 electric generators for the project. The generator capacity is 86.7 MVA.
Methodology
All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.