The Ugljevik 3 Thermal Power Plant is 700MW coal fired power project. It is planned in Ugljevik, Bosnia and Herzegovina. The project is currently in permitting stage. It will be developed in multiple phases. The project construction is likely to commence in 2023 and is expected to enter into commercial operation in 2025.

Project Type Total Capacity (MW) Active Capacity (MW) Pipeline Capacity (MW) Project Status Project Location Project Developer
Thermal 700 700 Permitting Ugljevik, Bosnia and Herzegovina Comsar Energy RS

Description

The project is being developed and currently owned by Comsar Energy RS.

It is a steam turbine power plant that will be used for Baseload. The fuel will be procured from Delici, Peljave-Tobut and Baljak Surface mines.

The project will generate 4,380,000MWh of electricity. The project cost is expected to be around $1,100m.

The project consists of 2 turbines.

Development Status

The project construction is expected to commence from 2023. Subsequent to that it will enter into commercial operation by 2025.

Contractors Involved

China Power Engineering Consulting Group is expected to render EPC services for the coal fired power project.

Methodology

All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.