Usta is an 180MW hydro power project. It is located on Hallingdal river/basin in Akershus, Norway. The project is currently active. It has been developed in single phase. The project construction commenced in 1962 and subsequently entered into commercial operation in 1965.
Project Type | Total Capacity (MW) | Active Capacity (MW) | Pipeline Capacity (MW) | Project Status | Project Location | Project Developer | Hydropower | 180 | 180 | – | Active | Akershus, Norway |
---|
Description
E-CO Energi Holding, Vardar and Akershus Energi are currently owning the project having ownership stake of 57.14%, 28.57% and 14.28% respectively.
Usta is a reservoir based project. The gross head and net head of the project are 540m and 510m respectively. The project generated 780 GWh of electricity.
The hydro power project consists of 2 turbines, each with 91.9MW nameplate capacity.
The project has 2 electric generators installed at the site. The generator capacity is 100 MVA.

US Tariffs are shifting - will you react or anticipate?
Don’t let policy changes catch you off guard. Stay proactive with real-time data and expert analysis.
By GlobalDataDevelopment Status
The project construction commenced in 1962 and subsequently entered into commercial operation in 1965.
Methodology
All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.