Uvdal is a 132MW hydro power project. It is located on Numedalslagen river/basin in Vestfold og Telemark, Norway. The project is currently active. It has been developed in multiple phases. The project construction commenced in 1963 and subsequently entered into commercial operation in 1966.
Project Type | Total Capacity (MW) | Active Capacity (MW) | Pipeline Capacity (MW) | Project Status | Project Location | Project Developer | Hydropower | 132 | 132 | – | Active | Vestfold og Telemark, Norway |
---|
Description
Skagerrak Energi and E-CO Energi Holding are currently owning the project having ownership stake of 90% and 10% respectively.
Uvdal is a reservoir based project. The project generated 492 GWh of electricity.
Uvdal (Uvdal 2) consists of 2 units of francis turbines with 21MW nameplate capacity.
The project consists of 4 generators.

US Tariffs are shifting - will you react or anticipate?
Don’t let policy changes catch you off guard. Stay proactive with real-time data and expert analysis.
By GlobalDataDevelopment Status
The project construction commenced in 1963 and subsequently entered into commercial operation in 1966.
Contractors Involved
Uvdal (Uvdal 1) is equipped with Andritz Hydro pelton turbines. The phase consists of 2 turbines.
Methodology
All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.