Wallsee-Mitterkirchen is a 210MW hydro power project. It is located on Danube river/basin in Lower Austria, Austria. The project is currently active. It has been developed in single phase. The project construction commenced in 1965 and subsequently entered into commercial operation in 1968.
Project Type | Total Capacity (MW) | Active Capacity (MW) | Pipeline Capacity (MW) | Project Status | Project Location | Project Developer | Hydropower | 210 | 210 | – | Active | Lower Austria, Austria |
---|
Description
The project is currently owned by VERBUND Hydro Power.
Wallsee-Mitterkirchen is a run-of-river project. The gross head of the project is 10.8m. The project generated 1,342.26 MWh of electricity.
Development Status
The project construction commenced in 1965 and subsequently entered into commercial operation in 1968.
How well do you really know your competitors?
Access the most comprehensive Company Profiles on the market, powered by GlobalData. Save hours of research. Gain competitive edge.
Thank you!
Your download email will arrive shortly
Not ready to buy yet? Download a free sample
We are confident about the unique quality of our Company Profiles. However, we want you to make the most beneficial decision for your business, so we offer a free sample that you can download by submitting the below form
By GlobalDataContractors Involved
The turbines for the hydro power project have been supplied by Nydqvist & Holm and Voith Hydro Holding.
Andritz Hydro supplied electric generator(s) for the project. The generator capacity is 42.5 MVA.
Andritz Hydro supplied electric generator(s) for the project. The generator capacity is 44 MVA.
Methodology
All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.