White Rock/Slab Creek is a 224MW hydro power project. It is located on South Fork American River river/basin in California, the US. The project is currently active. It has been developed in single phase. The project construction commenced in 1967 and subsequently entered into commercial operation in 1968.

Project Type Total Capacity (MW) Active Capacity (MW) Pipeline Capacity (MW) Project Status Project Location Project Developer
Hydropower 224 224 Active California, the US

Description

The project is currently owned by Sacramento Municipal Utility District.

White Rock/Slab Creek is a run-of-river project. The hydro reservoir capacity is 20.476 million cubic meter. The total number of penstocks, pipes or long channels that carry water down from the hydroelectric reservoir to the turbines inside the actual power station, are 2 in number.

The hydro power project consists of 1 turbine with 112.9MW nameplate capacity.

The hydro power project consists of 1 turbine with 115.48MW nameplate capacity.

How well do you really know your competitors?

Access the most comprehensive Company Profiles on the market, powered by GlobalData. Save hours of research. Gain competitive edge.

Company Profile – free sample

Thank you!

Your download email will arrive shortly

Not ready to buy yet? Download a free sample

We are confident about the unique quality of our Company Profiles. However, we want you to make the most beneficial decision for your business, so we offer a free sample that you can download by submitting the below form

By GlobalData
Visit our Privacy Policy for more information about our services, how we may use, process and share your personal data, including information of your rights in respect of your personal data and how you can unsubscribe from future marketing communications. Our services are intended for corporate subscribers and you warrant that the email address submitted is your corporate email address.

The project has 1 electric generator installed at the site.

Development Status

The project construction commenced in 1967 and subsequently entered into commercial operation in 1968.

Methodology

All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.