Wuskwatim is a 211MW hydro power project. It is located on Burntwood river/basin in Manitoba, Canada. The project is currently active. It has been developed in single phase. The project construction commenced in 2006 and subsequently entered into commercial operation in 2012.
Project Type | Total Capacity (MW) | Active Capacity (MW) | Pipeline Capacity (MW) | Project Status | Project Location | Project Developer | Hydropower | 211 | 211 | – | Active | Manitoba, Canada | Wuskwatim Power Ltd Partnership |
---|
Description
The project was developed by Wuskwatim Power Ltd Partnership. Manitoba Hydro-Electric Board and Nisichawayasihk Cree Nation are currently owning the project having ownership stake of 67% and 33% respectively.
Wuskwatim is a run-of-river project. The net head of the project is 21m. The project cost is $1,370m.
Development Status
The project construction commenced in 2006 and subsequently entered into commercial operation in 2012.

US Tariffs are shifting - will you react or anticipate?
Don’t let policy changes catch you off guard. Stay proactive with real-time data and expert analysis.
By GlobalDataContractors Involved
Andritz Hydro was selected as the turbine supplier for the hydro power project. The company provided 3 units of propeller turbines, each with 70MW nameplate capacity.
Andritz Hydro supplied 3 electric generators for the project. The generator capacity is 87.4 MVA.
Methodology
All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.