Power Technology | Energy News and Market Analysis is using cookies

We use them to give you the best experience. If you continue using our website, we'll assume that you are happy to receive all cookies on this website.

ContinueLearn More X
X

The Hastings Hydrokinetic Power Station Project, USA

Start of operation

20 August, 2009

Output

100kW for Unit 1, 150kW for Unit 2

Project type

Hydrokinetic Power Station

Location

Hastings, Minnesota, US

Project owner

Hydro Green Energy

Turbine units fabrication

Hydro Green Energy/TC/American

Barge System

Portable Barge Service

Rotor Rotational Speed

21rpm

Cut-in Speed

1m/s

Maximum Rated Speed

3.5m/s

Rated Electric Power

100kW at 3.5m/s

Rotor Diameter

12ft

Exit Duct Length

8ft

Exit Duct Area

200ft²

Runner depth below surface

3ft
Expand

Free download worth over $5000
Download our 2019 Technology, Media and Telecoms Predictions Report

Worth up to $5,850

In this report, we look at the 30 big tech themes for 2019, identifying winners and losers for each theme. This report will impact all industries helping:

  • CEOs/Senior Staff: in all industries understand the disruptive threats to their competitive landscape
  • Investors: Helps fund managers focus their time on the most interesting investment opportunities in global TM
Close
Close
Close

© Copyright 2019 Verdict Media Limited.

Go Top