Thorold Cogeneration Project, Ontario, Canada

Construction started September

July 2007

Start of Operation

Q2 2010

Output

305MW, including electricity and steam to the Abitibi-Consolidated Company of Canada (ACCC)

Plant Type

Cogeneration

Location

Thorold, Ontario, Canada

Estimated Investment

US$520m

Developer

Thorold CoGen LP

Plant Owner/operator

Northland Power

Engineer, Procure and Construct

V.K. Mason Construction Co.

Financing

Bank of Montreal, the Manufacturer’s Life Insurance Company, Sun Life Assurance Company, Northland Power Income Fund, Manulife, and Northland Power

Plant Equipment

GE 7FA gas turbine generator, HRSG, 95MW extraction/condensing steam turbine generator, 9MW back-pressure steam turbine generator, and two auxiliary boilers

Additional Equipment

Overhead 230kV transmission line. Landfill gas interconnection and routing from Enbridge

Fuel

High and low pressure natural gas, and landfill gas

Commissioning

Q2 2010
Expand

Free download worth over $5000
Download our 2019 Technology, Media and Telecoms Predictions Report

Worth up to $5,850

In this report, we look at the 30 big tech themes for 2019, identifying winners and losers for each theme. This report will impact all industries helping:

  • CEOs/Senior Staff: in all industries understand the disruptive threats to their competitive landscape
  • Investors: Helps fund managers focus their time on the most interesting investment opportunities in global TM
Close
Close
Close

© Copyright 2019 Verdict Media Limited.

Go Top