Baghdara is a 239.1MW hydro power project. It is planned on Panjshir river/basin in Parwan, Afghanistan. The project is currently in announced stage. It will be developed in multiple phases. The project construction is likely to commence in 2023 and is expected to enter into commercial operation in 2025.
Project Type | Total Capacity (MW) | Active Capacity (MW) | Pipeline Capacity (MW) | Project Status | Project Location | Project Developer | Hydropower | 239.1 | – | 239.1 | Announced | Parwan, Afghanistan |
---|
Description
The project is currently owned by Ministry of Energy and Water, Afghanistan.
Baghdara is a reservoir based project. The hydro reservoir capacity is planned to be 400 million cubic meter. The project is expected to generate 874.6 GWh of electricity. The project cost is expected to be around $585.9m.
Baghdara (Baghdara Auxiliary Powerhouse) consists of 1 unit of francis turbine with 12.6MW nameplate capacity.
Baghdara (Baghdara Main Powerhouse) consists of 4 units of francis turbines.

US Tariffs are shifting - will you react or anticipate?
Don’t let policy changes catch you off guard. Stay proactive with real-time data and expert analysis.
By GlobalDataDevelopment Status
The project construction is expected to commence from 2023. Subsequent to that it will enter into commercial operation by 2025.
Methodology
All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.