Miboro 1 is a 215MW hydro power project. It is located on Sho river/basin in Gifu, Japan. The project is currently active. It has been developed in single phase. The project construction commenced in 1957 and subsequently entered into commercial operation in 1961.
Project Type | Total Capacity (MW) | Active Capacity (MW) | Pipeline Capacity (MW) | Project Status | Project Location | Project Developer | Hydropower | 215 | 215 | – | Active | Gifu, Japan |
---|
Description
The project is currently owned by Electric Power Development.
The hydro reservoir capacity is 370 million cubic meter. The net head of the project is 192.1m.
The hydro power project consists of 2 turbines, each with 128MW nameplate capacity.
The project has 2 electric generators installed at the site. The generator capacity is 125 MVA.

US Tariffs are shifting - will you react or anticipate?
Don’t let policy changes catch you off guard. Stay proactive with real-time data and expert analysis.
By GlobalDataDevelopment Status
The project construction commenced in 1957 and subsequently entered into commercial operation in 1961.
Methodology
All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.