Datang Luoyang Shouyangshan Power Plant is a 1,000MW coal fired power project. It is located in Henan, China. The project is currently active. It has been developed in multiple phases.
| Project Type | Total Capacity (MW) | Active Capacity (MW) | Pipeline Capacity (MW) | Project Status | Project Location | Project Developer | Thermal | 1,000 | 1,000 | – | Active | Henan, China |
|---|
Description
Discover B2B Marketing That Performs
Combine business intelligence and editorial excellence to reach engaged professionals across 36 leading media platforms.
The project is currently owned by China Datang.
It is a Steam Turbine power plant.
Contractors Involved
Datang Luoyang Shouyangshan Power Plant (Datang Luoyang Shouyangshan Power Plant Phase I Unit I) is equipped with DEC Dongfang Steam Turbine N220-12.75 / 535/535 steam turbine. The phase consists of 1 steam turbine with 200MW nameplate capacity.
US Tariffs are shifting - will you react or anticipate?
Don’t let policy changes catch you off guard. Stay proactive with real-time data and expert analysis.
By GlobalDataDatang Luoyang Shouyangshan Power Plant (Datang Luoyang Shouyangshan Power Plant Phase I Unit II) is equipped with DEC Dongfang Steam Turbine N210-12.75 / 535/535 steam turbine. The phase consists of 1 steam turbine with 200MW nameplate capacity.
Datang Luoyang Shouyangshan Power Plant (Datang Luoyang Shouyangshan Power Plant Phase II Unit I) is equipped with Mitsubishi Power SDGC-33.5 steam turbine. The phase consists of 1 steam turbine with 300MW nameplate capacity.
Datang Luoyang Shouyangshan Power Plant (Datang Luoyang Shouyangshan Power Plant Phase II Unit II) is equipped with Mitsubishi Power SDGC-33.5 steam turbine. The phase consists of 1 steam turbine with 300MW nameplate capacity.
DEC Dongfang Electric Machinery supplied QFSN 220-2 electric generator for the Datang Luoyang Shouyangshan Power Plant (Datang Luoyang Shouyangshan Power Plant Phase I Unit I).
DEC Dongfang Electric Machinery supplied QFSN2-220-2 electric generator for the Datang Luoyang Shouyangshan Power Plant (Datang Luoyang Shouyangshan Power Plant Phase I Unit II).
DEC Dongfang Electric Machinery supplied QFSN-300-2-20 electric generator for the Datang Luoyang Shouyangshan Power Plant (Datang Luoyang Shouyangshan Power Plant Phase II Unit I).
DEC Dongfang Electric Machinery supplied QFSN-300-2-20 electric generator for the Datang Luoyang Shouyangshan Power Plant (Datang Luoyang Shouyangshan Power Plant Phase II Unit II).
Dongfang Boiler Group supplied steam boiler for the Datang Luoyang Shouyangshan Power Plant (Datang Luoyang Shouyangshan Power Plant Phase I Unit I).
Dongfang Boiler Group supplied steam boiler for the Datang Luoyang Shouyangshan Power Plant (Datang Luoyang Shouyangshan Power Plant Phase I Unit II).
Dongfang Boiler Group supplied steam boiler for the Datang Luoyang Shouyangshan Power Plant (Datang Luoyang Shouyangshan Power Plant Phase II Unit I).
Dongfang Boiler Group supplied steam boiler for the Datang Luoyang Shouyangshan Power Plant (Datang Luoyang Shouyangshan Power Plant Phase II Unit II).
Methodology
All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.
