Frieira is a 130MW hydro power project. It is located on Mino river/basin in Galicia, Spain. The project is currently active. It has been developed in single phase.
Project Type | Total Capacity (MW) | Active Capacity (MW) | Pipeline Capacity (MW) | Project Status | Project Location | Project Developer | Hydropower | 130 | 130 | – | Active | Galicia, Spain |
---|
Description
The project is currently owned by Naturgy Energy Group.
Frieira is a reservoir based project. The hydro reservoir capacity is 44.41 million cubic meter. The net head of the project is 24.5m.
Contractors Involved
Voith Hydro Holding was selected as the turbine supplier for the hydro power project. The company provided 2 units of kaplan turbines, each with 65MW nameplate capacity.

US Tariffs are shifting - will you react or anticipate?
Don’t let policy changes catch you off guard. Stay proactive with real-time data and expert analysis.
By GlobalDataGE Renewable Energy supplied 1 electric generator for the project.
Methodology
All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.