Medway (England) Power Plant is a 735MW gas fired power project. It is located in England, the UK. The project is currently active. It has been developed in single phase. Post completion of construction, the project got commissioned in 1995.
Project Type | Total Capacity (MW) | Active Capacity (MW) | Pipeline Capacity (MW) | Project Status | Project Location | Project Developer | Thermal | 735 | 735 | – | Active | England, the UK |
---|
Description
The project is currently owned by SSE with a stake of 100%.
It is a Combined Cycle Gas Turbine (CCGT) power plant.
Development Status
The project got commissioned in 1995.

US Tariffs are shifting - will you react or anticipate?
Don’t let policy changes catch you off guard. Stay proactive with real-time data and expert analysis.
By GlobalDataContractors Involved
GE Power was selected as the turbine supplier for the Gas fired project. The Gas fired project consists of 1 steam turbine.
GE Power was selected as the turbine supplier for the Gas fired project. The company provided 2 units of Frame 9FA gas turbines.
GE Power supplied electric generator for the project.
The steam boilers for the gas fired power project have been supplied byClayton Industries and Nooter.
Methodology
All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.