Abadan Combined Cycle Power Plant is an 813.6MW gas fired power project. It is located in Khuzestan, Iran. The project is currently active. It has been developed in multiple phases. Post completion of construction, the project got commissioned in March 2003.

Project Type Total Capacity (MW) Active Capacity (MW) Pipeline Capacity (MW) Project Status Project Location Project Developer
Thermal 813.6 813.6 Active Khuzestan, Iran

Description

The project is currently owned by Iran Power Development.

It is a Combined Cycle Gas Turbine (CCGT) power plant. The power plant run on dual-fuel. The primary fuel being used to power the plant is natural gas. In case of shortage of natural gas the plant can also run on Gas Oil.

Development Status

The project got commissioned in March 2003.

GlobalData Strategic Intelligence

US Tariffs are shifting - will you react or anticipate?

Don’t let policy changes catch you off guard. Stay proactive with real-time data and expert analysis.

By GlobalData

Contractors Involved

Calik Enerji Elektrik Uetim ve Madencilik and MAPNA Combined Cycle Power plants Constraction & Development were selected to render EPC services for the gas fired power project.

Abadan Combined Cycle Power Plant (Abadan Combined Cycle Power Plant Block I Unit I) is equipped with GE Power PG9161-E gas turbine. The phase consists of 1 gas turbine with 123.4MW nameplate capacity.

Abadan Combined Cycle Power Plant (Abadan Combined Cycle Power Plant Block I Unit II) is equipped with GE Power PG9161-E gas turbine. The phase consists of 1 gas turbine with 123.4MW nameplate capacity.

Abadan Combined Cycle Power Plant (Abadan Combined Cycle Power Plant Block I Unit III) is equipped with MAPNA Turbine Engineering & Manufacturing steam turbine. The phase consists of 1 steam turbine with 160MW nameplate capacity.

Abadan Combined Cycle Power Plant (Abadan Combined Cycle Power Plant Block II Unit I) is equipped with GE Power PG9161-E gas turbine. The phase consists of 1 gas turbine with 123.4MW nameplate capacity.

Abadan Combined Cycle Power Plant (Abadan Combined Cycle Power Plant Block II Unit II) is equipped with GE Power PG9161-E gas turbine. The phase consists of 1 gas turbine with 123.4MW nameplate capacity.

Abadan Combined Cycle Power Plant (Abadan Combined Cycle Power Plant Block II Unit III) is equipped with MAPNA Turbine Engineering & Manufacturing steam turbine. The phase consists of 1 steam turbine with 160MW nameplate capacity.

MAPNA Generator Engineering & Manufacturing supplied electric generator for the project.

MAPNA Boiler Engineering & Manufacturing supplied steam boiler for the project.

Methodology

All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.