Ormazabal Achieves a New Offshore Milestone in the UK
The Thanet offshore wind farm is the largest operational wind farm in the world. It...
CGM-CGC 12/24kV range units will no longer be manufactured and supplied by Ormazabal after 31 December 2010.
The CGM-CGC 12/24kV system has developed into the CGMCOSMOS 12/24kV system, which was first introduced to the market in 2000.
After a period of co-existence of both systems, the manufacturing programme of the CGM-CGC 12/24kV comes to an end on 31 December. The technical solution offered from this date on will be the CGMCOSMOS system units.
For previously installed CGM-CGC 12/24kV units Ormazabal will offer the same after-sales services as before, supplying spare parts for at least five years after installation.
Furthermore, if necessary, extensibility of the installed CGM-CGC 12/24kV units can be performed by contacting our technical commercial department.
The Thanet offshore wind farm is the largest operational wind farm in the world. It...
In June 2011 Ormazabal carried out a workshop in Johannesburg. Ormazabal was introduced to 60...
Ormazabal has certified according to IEEE C37.74 and C37.20.3 (ANSI approved Aug 7 2003) the...
The Ormazabal team looks forward to seeing you at the Ormazabal booth 11929 and Ormazabal...