Angat Main is a 218MW hydro power project. It is located on Angat river/basin in Central Luzon, Philippines. The project is currently active. It has been developed in multiple phases. Post completion of construction, the project got commissioned in 1967.
Project Type | Total Capacity (MW) | Active Capacity (MW) | Pipeline Capacity (MW) | Project Status | Project Location | Project Developer | Hydropower | 218 | 218 | – | Active | Central Luzon, Philippines |
---|
Description
SMC Global Power Holdings and Korea Water Resources are currently owning the project having ownership stake of 60% and 40% respectively.
Angat Main is a reservoir based project. The hydro reservoir capacity is 850 million cubic meter. Angat Main (Angat Auxiliary units 1,2) underwent through rehabilitation & modernization during 1989-1990.Angat Main (Angat Main Phase I) underwent through rehabilitation & modernization during 1985-1987.Angat Main (Angat Main Phase II) underwent through rehabilitation & modernization during 1988-1989.
Angat Main (Angat Auxiliary unit 3) consists of 1 unit of francis turbine with 6MW nameplate capacity.
Development Status
How well do you really know your competitors?
Access the most comprehensive Company Profiles on the market, powered by GlobalData. Save hours of research. Gain competitive edge.
Thank you!
Your download email will arrive shortly
Not ready to buy yet? Download a free sample
We are confident about the unique quality of our Company Profiles. However, we want you to make the most beneficial decision for your business, so we offer a free sample that you can download by submitting the below form
By GlobalDataThe project got commissioned in 1967.
Contractors Involved
Angat Main (Angat Auxiliary units 1,2) is equipped with Toshiba Energy Systems and Solutions francis turbines. The phase consists of 2 turbines with 6MW nameplate capacity.
Angat Main (Angat Main Phase I) is equipped with Toshiba Energy Systems and Solutions francis turbines. The phase consists of 2 turbines with 52MW nameplate capacity.
Angat Main (Angat Main Phase II) is equipped with Toshiba Energy Systems and Solutions francis turbines. The phase consists of 2 turbines with 52MW nameplate capacity.
Toshiba Energy Systems and Solutions supplied 2 electric generators for the Angat Main (Angat Auxiliary units 1,2). The generator capacity is 6.66 MVA.
GE Renewable Energy supplied 2 electric generators for the Angat Main (Angat Main Phase I). The generator capacity is 55.55 MVA.
GE Renewable Energy supplied 2 electric generators for the Angat Main (Angat Main Phase II). The generator capacity is 55.55 MVA.
Methodology
All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.