Brotas Biomass Power Plant I is a 70MW biopower project. It is located in Sao Paulo, Brazil. The project is currently active. It has been developed in single phase. Post completion of construction, the project got commissioned in May 2013.

Project Type Total Capacity (MW) Active Capacity (MW) Pipeline Capacity (MW) Project Status Project Location Project Developer
Biopower 70 70 Active Sao Paulo, Brazil Rhodia Brasil

Description

The project was developed by Rhodia Brasil.

The project generates 300GWh of electricity. The project cost is $80.568m.

Brotas Biomass Power Plant I is a combined heat and power (CHP) project. Bagasse which is a kind of agricultural by-product is used as a feedstock to power the project.

The project consists of 2 turbines, each with 35MW nameplate capacity.

GlobalData Strategic Intelligence

US Tariffs are shifting - will you react or anticipate?

Don’t let policy changes catch you off guard. Stay proactive with real-time data and expert analysis.

By GlobalData

Development Status

The project got commissioned in May 2013.

Methodology

All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.