Frank A Tracy Combined Cycle Power Station is a 743.1MW gas fired power project. It is located in Nevada, the US. The project is currently active. It has been developed in multiple phases. Post completion of construction, the project got commissioned in 1994.
Project Type | Total Capacity (MW) | Active Capacity (MW) | Pipeline Capacity (MW) | Project Status | Project Location | Project Developer | Thermal | 743.1 | 743.1 | – | Active | Nevada, the US |
---|
Description
The project is currently owned by NV Energy.
It is a Combined Cycle Gas Turbine (CCGT) power plant that is used for Peakload. The fuel is procured from Paiute Tuscarora.
The project generated 3,518,071MWh of electricity.
Development Status
How well do you really know your competitors?
Access the most comprehensive Company Profiles on the market, powered by GlobalData. Save hours of research. Gain competitive edge.
Thank you!
Your download email will arrive shortly
Not ready to buy yet? Download a free sample
We are confident about the unique quality of our Company Profiles. However, we want you to make the most beneficial decision for your business, so we offer a free sample that you can download by submitting the below form
By GlobalDataThe project got commissioned in 1994.
Contractors Involved
Frank A Tracy Combined Cycle Power Station (Frank A Tracy Combined Cycle Power Station Block I Unit I) is equipped with GE Power 6F.03 gas turbine. The phase consists of 1 gas turbine with 69.7MW nameplate capacity.
Frank A Tracy Combined Cycle Power Station (Frank A Tracy Combined Cycle Power Station Block I Unit II) is equipped with GE Power steam turbine. The phase consists of 1 steam turbine with 50.2MW nameplate capacity.
Frank A Tracy Combined Cycle Power Station (Frank A Tracy Combined Cycle Power Station Block II) is equipped with GE Power steam turbine. The phase consists of 1 steam turbine with 312MW nameplate capacity.
Frank A Tracy Combined Cycle Power Station (Frank A Tracy Combined Cycle Power Station Block II) is equipped with GE Power 7F.04 gas turbines. The phase consists of 2 gas turbines with 115.6MW nameplate capacity.
GE Power supplied electric generator for the Frank A Tracy Combined Cycle Power Station (Frank A Tracy Combined Cycle Power Station Block I Unit I).
GE Power supplied electric generator for the Frank A Tracy Combined Cycle Power Station (Frank A Tracy Combined Cycle Power Station Block I Unit II).
GE Power supplied electric generator for the Frank A Tracy Combined Cycle Power Station (Frank A Tracy Combined Cycle Power Station Block II).
Nooter/Eriksen supplied steam boiler for the Frank A Tracy Combined Cycle Power Station (Frank A Tracy Combined Cycle Power Station Block II).
Methodology
All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.