Mobin Petrochemical Cogeneration Plant is a 986.4MW gas fired power project. It is located in Bushehr, Iran. The project is currently active. It has been developed in multiple phases. Post completion of construction, the project got commissioned in June 2006.
Project Type | Total Capacity (MW) | Active Capacity (MW) | Pipeline Capacity (MW) | Project Status | Project Location | Project Developer | Thermal | 986.4 | 986.4 | – | Active | Bushehr, Iran |
---|
Description
The project is currently owned by Mobin Petrochemical.
It is a Gas Turbine with Cogen power plant. The power plant run on dual-fuel. The primary fuel being used to power the plant is gas. In case of shortage of gas the plant can also run on Diesel.
Development Status
The project got commissioned in June 2006.
How well do you really know your competitors?
Access the most comprehensive Company Profiles on the market, powered by GlobalData. Save hours of research. Gain competitive edge.
Thank you!
Your download email will arrive shortly
Not ready to buy yet? Download a free sample
We are confident about the unique quality of our Company Profiles. However, we want you to make the most beneficial decision for your business, so we offer a free sample that you can download by submitting the below form
By GlobalDataContractors Involved
MAPNA Group was selected to render EPC services for the gas fired power project.
GE Power was selected as the turbine supplier for thermal power project. The project consists of 8 units of Frame 9 turbines, each with 123.3MW nameplate capacity.
Amec Foster Wheeler supplied steam boiler for the project.
Methodology
All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.