Palmiet is a 400MW hydro power project. It is located on Palmiet river/basin in Western Cape, South Africa. The project is currently active. It has been developed in single phase. The project construction commenced in 1983 and subsequently entered into commercial operation in 1988.

Project Type Total Capacity (MW) Active Capacity (MW) Pipeline Capacity (MW) Project Status Project Location Project Developer
Hydropower 400 400 Active Western Cape, South Africa

Description

Department of Water Affairs and Forestry, South Africa and Eskom Holdings SOC are currently owning the project.

Palmiet is a pumped storage project. The hydro reservoir capacity is 19.3 million cubic meter. The gross head of the project is 285.6m. The total number of penstocks, pipes or long channels that carry water down from the hydroelectric reservoir to the turbines inside the actual power station, are 2 in number. The penstock length is 700m. The penstock diameter is 3.9m.

Development Status

The project construction commenced in 1983 and subsequently entered into commercial operation in 1988.

Contractors Involved

Voith Hydro was selected as the turbine supplier for the hydro power project. The company provided 2 units of francis turbines, each with 200MW nameplate capacity.

Fuji Electric supplied 2 electric generators for the project. The generator capacity is 250 MVA.

Methodology

All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.