El Tebbin Power Plant is a 700MW dual-fuel fired power project. It is located in Cairo, Egypt. According to GlobalData, who tracks and profiles over 170,000 power plants worldwide, the project is currently active. It has been developed in a single phase. Post completion of construction, the project got commissioned in 2010. Buy the profile here.
Description
The project is currently owned by Cairo Electricity Production with a stake of 100%.
It is a Steam Turbine power plant. The power plant run on dual-fuel. The primary fuel being used to power the plant is natural gas. In case of shortage of natural gas the plant can also run on Fuel Oil.
The project generated 3,014,000MWh of electricity.
Development status
The project got commissioned in 2010.
Contractors involved
GE Power was selected as the turbine supplier for the Dual-Fuel fired project. The company provided 2 steam turbines, each with 350MW nameplate capacity.
GE Power supplied electric generator for the project.
GE Power supplied electric generator for the project.
AC Boilers supplied steam boiler for the project.
AC Boilers supplied steam boiler for the project.